Site office stacks
2-storey link
China supplier sourcing desk
Reds10 coordinates supplier matching, quotation comparison, sample review, inspection checkpoints, and export preparation for modular building buyers. Share the project location and design basis before comparing offers.
2-storey link
Acoustic core
MEP interface
Repeat bay
These labels describe the procurement workflow, not audited company capacity. Manufacturing and compliance claims must be documented by the selected supplier for each project.
For a cold-climate office inquiry, request project wind and ground snow criteria, the proposed PIR wall build-up, and evidence for corridor connections. The shortlisted supplier must show its structural basis; the local engineer of record confirms the permit path.
For a classroom request, compare acoustic and thermal targets alongside the supplier panel declaration. A claimed fire duration must match the tested wall assembly and cannot be extended automatically to doors, joints, penetrations, or the whole building.
For clinical modules, define the proposed electrical and plumbing stop line in the supplier drawing. Local professionals must verify HVAC, medical gas, hygiene finishes, and installation rules. Request steel grade and inspection evidence for the actual supplier frame.
For a workforce camp, ask suppliers to state the frame seismic basis, lifting-point layout, and transport envelope. A local structural engineer should design the foundations. Module dimensions alone do not imply ISO CSC certification or permission to move on every road.
Stacking, stair wind, and a short lease life.
Acoustic core and a daylight plan.
Service risers and hygiene finishes.
Repeat bays and sanitary stacks.
Grease extract and a clear span bay.
Small plan, high glazing ratio.
Record use, destination, quantity, dimensions, storeys, and delivery date.
Shortlist suppliers against the requested system, transport envelope, and documentary evidence.
Normalize shell, envelope, MEP interface, packing, and exclusions before price comparison.
Align samples and third-party inspection checkpoints with the buyer-approved specification.
Review packing lists, shipment documents, and destination port details with the chosen supplier.
Send country, quantity, storeys, climate loads, finish scope, and destination port. We coordinate supplier responses and flag missing evidence before a quote becomes a purchase decision.
Open the project desk